Ramset C801X750 750ml Heavy Duty Anchoring Injection Adhesive
Heavy Duty Epoxy Acrylate for anchoring threaded studs and reinforcing bar into solid concrete, stone, hollow brick and hollow concrete block. High bond strength for diamond and carbide drilled holes. Fast cure for high bond strength for diamond and carbide drilled holes. Fast cure for high productivity. Non- drip formula, ideal for over-head installation. Styrene free low order formula. Steel columns, and beams, starter bars, road stitching, seating, hand rails.
Includes:
Features & Benefits:
- Excellent chemical resistance
- Suitable for use in contact with drinking water
- Strong bond
Specifications:
- Chemical Type: Epoxy
- Density 1.30kg / litre @ 20°C Heat Distortion temperature
- Approx. 80°C Hardness > Shore D 80
- Compressive Strength (AS1012.9)
- 75MpaWater Absorption (ASTM D570)
- < 0.2 % (10 days @ 25°C) Modulus Of Elasticity
- > 4 GPa
- Tensile Strength > 25 Mpa
- Flexural Strength Approx. 22 MPa
- Contact with drinking water AS/NZS4020
- New Cell Service Temperature Limits -10°C to 80° C; Working time (min) @ 20°C 6 to 10
- Loading Time @ 20°C 14 hours
- Min Installation Temp (°C) 5Max Installation Temp (°C) 40Min Service Temp (°C)-10° Max Service Temp (°C) 80SubstratesSolid Concrete,Solid Stone (proof loading recommended),
- Solid Brick
Trade Application
- Concreter Starter Bars
- Buliding ContractorThreaded Studs, Starter Bars
- Civil ContractorStarter Bars Steel Fabricator Threaded Studs Balustrade Contractor Threaded Studs Formworker Starter Bars
- BricklayerStarter Bars
- FitterThreaded StudsSeating Contractor
- Threaded Studs
Installation in solid
- Drill or core hole to specified diameter and depth
- Remove dust and debris by brushing and blowing 3 times each (if hole is wet or flooded, remove excess water using wet / dry vacuum and allow to dry)
- Screw mixing nozzle onto cartridge and dispense 2-3 trigger pulls of adhesive to waste until colour is grey with no streaks
- Insert tip of Nozzle to bottom of the hole and dispense adhesive
- Fill hole to about 2/3 full
- Insert threaded stud or reinforcing bar with rotating motion to release trapped air
- Wait until adhesive has fully cured before loading
- Protect from water contact for 24 hours
- Clean up with acetone