Ramset C101J (Chemset™ 101) 750ml Medium Duty Anchoring Injection Adhesive
Fast Cure, medium duty anchoring of threaded studs and reinforcing bar into solid concrete, stone, hollow brick and hollow concrete block.Versatile, multi-purpose two part polyester anchoring system. Fast cure for high productivity. Non-drip formula, ideal for overhead installation.Steel Columns and beams, seating, machinery, facade pins, handrails, gates, starter bars, bottom plate fixing
Features & Benefits:
- Easy dispensing, even in cold weather
- Sag resistant formula for horizontal holes and overhead application
- Tap value to preserve contents between uses.
Key Features:
- Fast Cure
- Solid and hollow Substrates
- Easy dispensing all year round
Includes:
Specifications:
Properties
Typical Value
AppearancePart A: Mauve part B: Green
Mixed: Green / Grey
Chemical Type
Polyester
Density1.55kg / Litre @ 20?CHardness> Shore D 80
Heat Distortion Temperature
Approx. 80?CCompressive Strength (ASTM C579-01)
20 MPaWorking time (min) @ 20?C
5 to 10
Loading Time @ 20?C 90 minute s
Min Installation Temp (?C) 0Max Installation Temp (?C) 43Min Service Temp (?C) -10Max Service Temp (?C) 80SubstratesSolid Concrete, Solid Stone (proof loading recommended),
Solid Brick, Hollow Concrete Block, Hollow Brick
TradeApplication
ConcreterStarter Bars
Buliding ContractorThreaded Studs, Starter Bars, Hollow Masonry Sleeves, Remedial Wall Ties
Civil ContractorStarter Bars Steel Fabricator Threaded Studs, Hollow Masonry Sleeves Balustrade Contractor Threaded Studs, Hollow Masonry Sleeves FormworkerStarter Bars
BricklayerStarter Bars, Remedial Wall Ties FitterThreaded Studs, Hollow Masonry Sleeves Seating Contractor
Threaded Studs Facade Contractor
Threaded Studs
Uses:
- Machinery hold down
- Structural steel connections
- Raker angles
- Column hold down
- Seating
- Hand rails
- Fencing
- Ballustrade posts
- Starter bars
- Timber and steel house frame bottom plates to comply with BCA and Wind Code
- Close to edge applications
- Safety barriers
Installation in solid
Drill hole to specified diameter and depth Remove dust and debris by brushing and blowing 3 times each (if hole is wet or flooded, brush only remove water and slurry with wet / dry vacuum) Screw mixing nozzle onto cartridge and dispense 2-3 trigger pulls of adhesive to waste until colour is green / grey with no streaks Insert tip of Nozzle to bottom of the hole and dispense adhesive Fill hole to about 2/3 full Insert threated stud or reinforcing bar with rotating motion to release trapped air Wait until adhesive has fully cured before loading Clean up with acetone